Farm Management

Monsoon Preparation Checklist for Every Farm

By Arjun Sharma · 4 min read

Monsoon Preparation Checklist

The monsoon is both a blessing and a risk. This 12-point checklist prepares your farm for the rains.

Soil & Field (4 points)

  1. Bund strengthening — repair field bunds to retain water
  2. Drainage channels — clear outflow channels to prevent waterlogging
  3. Soil test — get it done before the first rain (book via app)
  4. Green manure — incorporate dhaincha/sunhemp 3 weeks before sowing

Inputs (3 points)

  1. Seed stock — buy certified seeds 2 weeks before sowing
  2. Fertilizer plan — based on soil test, not habit
  3. Pesticide buffer — keep neem oil + one fungicide ready

Equipment (3 points)

  1. Sprayer service — clean nozzles, check pressure
  2. Pump check — test diesel/electric pumps before the season
  3. Tarpaulin — cover stored inputs against humidity

Records (2 points)

  1. Crop insurance — renew PMFBY/PMFBY before the deadline
  2. KCC review — check your Kisan Credit Card limit is adequate

The 48-Hour Rule

When the first monsoon rain is forecast:

Get village-level monsoon alerts from the PrajaAgro weather widget.

← All guides